CASE STUDY / SECO KÄLTETECHNIK - REFRIGERATION, AIR-CONDITIONING & HEATING TECHNOLOGY
SECO: A COOL SYSTEM
WITH THE BEST ON-SITE SUPPORT
The results:
- 52% fall in mileage across the route schedule
- Ecological savings via reduced travel: 900,000 kg CO2 reduction
- Transparent service processes thanks to the provision of extensive data material and its evaluation options
- Increased scheduling efficiency
FLS VISITOUR / FLS MOBILE
Industry:
REFRIGERATION, AIR-CONDITIONING & HEATING TECHNOLOGY
- Introduction of a software-based scheduling and route planning system and a mobile solution for 140 technicians
- Short implementation phase and rapid go-live
- Scalability of the planning solution
- Dynamic real-time planning for 24-hour emergency service
"Our employees are the key to our success. We want to create the best working conditions and work together to keep our knowledge up to date."
Björn Stemmermann · Seco Kältetechnik GmbHTHE CHALLENGE:
The decisive factor in selecting the software was a fast go-live, i.e. low implementation and configuration costs. However, scalability and flexibility in customising the software were also important to Seco, as FLS VISITOUR needed to reliably support the growth strategy and be able to react to new process requirements.
THE SOLUTION:
However, day-to-day business in the scheduling department also runs much more smoothly. According to Björn Stemmermann, authorised signatory and responsible for project management and IT, the FLS software has enabled a high level of transparency in the service processes. Up-to-date information on the planning status can be provided to the customer at any time, and detailed data analyses relating to the contractual relationship can also be made available.
The solution for route planning and dynamic optimisation in field service
The difference: You can re-optimise tours at any time during the day at the push of a button if something changes. This means that even the most dynamic field service operation is no longer a problem. - Discover your potential now:
THE BENEFITS:
- 52% fall in mileage across the route schedule
- Ecological savings via reduced travel: 900,000 kg CO2 reduction
- Transparent service processes thanks to the provision of extensive data material and its evaluation options
- Increased scheduling efficiency
"FLS knows our business very well, so far we have always received our requirements. We simply feel that we are in good hands."
Björn Stemmermann · SECO Kältetechnik GmbHWHERE IS YOUR OPTIMISATION POTENTIAL?
DISCOVER IT WITH FLS – FAST LEAN SMART
Choose the best way for you to get to know us:
DEMO
DISCOVER THE FULL POTENTIAL OF DYNAMIC SOFTWARE FOR YOUR BUSINESS
Experience the unsurpassed performance of our PowerOpt algorithm live. We will show you how to optimise your field force and services, and realise cost savings of up to 50% in a short time.